News Flash

Posted on: September 25, 2020

Birch Bay Drive Project Work Scheduled for the Week of Sept 28

Poor weather conditions postponed gravel paving between Lora Lane and the Bay Breeze Restaurant previously scheduled for Sept. 22-23. The week of Sept. 28 construction work will be from 5am-5pm. Granite will install stormwater catch basins along the weste...

Read on...

Public Works - Birch Bay Drive & Pedestrian Facility
Posted on: September 21, 2020

Birch Bay Work Postponed between Lora Lane and the Bay Breeze Restaurant

Expected rain this week has postponed gravel paving between Lora Lane and the Bay Breeze Restaurant previously scheduled for Sept. 22-23. We had asked the public to stay away during construction, but restrictions are postponed until the work begins.

Public Works - Birch Bay Drive & Pedestrian Facility
Posted on: August 11, 2020

Restoration Project will Deliver Logs via Helicopter; Public Should Not Approach Operation

BELLINGHAM, WA – Residents in Birch Bay may see a low-flying helicopter carrying logs in the area of Terrell Creek between Kickerville Road and Jackson Road as part of fish habitat improvements to the waterway. The habitat improvements will take...

Read on...

Public Works - Birch Bay Drive & Pedestrian Facility