Jackson Road/Terrell Creek Bridge No. 81 Replacement

Project Summary



Replacement of Jackson Road Bridge No. 81 over Terrell Creek located near the intersection of Jackson Road and Birch Bay Drive. The project will replace the existing structurally deficient and load restricted 62-foot bridge with a structure meeting current design standards.

Status



The project is entering Phase 1 which includes:
-    Topographic Survey/Site Reconnaissance
- Preliminary Engineering
- Community Engagement
- Type, Size, & Location Analysis

Phase 1 of the project is funded from the County's Road Fund.

Anticipated Project Timeline



Phase 1 - Topographic Survey, Preliminary Engineering, and Type, Size, & Location Analysis (to begin in 2020)
Phase 2 - Detailed Design & Permitting (2021-2022)
Phase 3 - Construction (TBD)


Contact Us


  1. Ben Floyd


    Project Engineer
    (360) 778-6252
    bfloyd@co.whatcom.wa.us

    James Lee


    Engineering Manager
    (360) 778-6264
    jlee@co.whatcom.wa.us

    322 N. Commercial Street, Suite 301
    Bellingham, WA 98225

    Phone: (360) 778-6210
    Fax: (360) 778-6211